-
Upper-Town Dam Final Design Plans
Final dam removal design plans for the Upper-Town Dam in Lisbon, Maine. This project removed a derelict mill dam that impounded 6 feet at water when the spillway was intact.... -
Snow Brook elevation/vegetation change
Before/After elevation/vegetation change -
Dune Elevation Transects (Post-Project)
This is data for elevation transects through dune restoration sites on the north coast of Puerto Rico. The transects begin in the shoreline and end where land vegetation begins.... -
Dune Elevation Transects (Pre-project)
This is data for elevation transects through dune restoration sites on the north coast of Puerto Rico. The transects begin in the shoreline and end where land vegetation begins.... -
Oriental, NC Living Shoreline
The N.C. Coastal Federation collected pre- and post-construction data at Whittaker Pointe in Oriental, NC where a 3,400 linear foot living shoreline was installed in 2020 .... -
Atlantic, NC Living Shoreline
The N.C. Coastal Federation collected pre- and post-construction data at White's Point in Atlantic, NC where a 1,700 linear foot living shoreline was installed in 2020 .... -
John Heinz NWR Bathymetric and Topography Data
Topography and bathymetric data set collected via RTK units by Ducks Unlimited and US Fish and Wildlife Service surveyors both inside and outside the NWR impoundment. Data were...